| List of completed projects in 2023 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Winter Relief Assistance | 1-Feb-23 | 15, March, 2023 | Humedica Internation Aid | Kabul | 54,000 | Completed |
| 2 | Provision of lifesaving food assistance to IPC Phase 3 and 4 food insecure vulnerable people in Shamal & Spera Districts of Khost Province | 25-Jan-23 | 24/09/2023 | AHF-OCHA | Khost | 532,080 | Completed |
| 3 | Mine Clearance and Survey in Nuristan | 6/1/2023 | 11/30/2023 | Japan Embassy | Nuristan | 509737 | Completed |
| List of completed projects in 2022 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Emergency Relief Assistance to Earthquake families | 21-Jun-22 | 22-Jul-22 | Humedica Internation Aid | Paktika | 50,000 | Completed |
| 2 | Mine Clearance and Survey in Kunar | 5-Sep-22 | 4-Mar-23 | AHF-OCHA | Kunar | 399000 | Completed |
| 3 | Mine Clearance and Survey in Nuristan | 8/10/2022 | 7/30/2023 | USDOS | Nuristan | 600000 | Completed |
| 4 | Cash distribution to flood effected families project in Badghis | 15-May-22 | 30-Jun-22 | Humedica Internation Aid | Badghis | 69,000 | Completed |
| 5 | Reconstruction of houses destroyed by the earthquake | 15-Mar-22 | 30-Jun-22 | Humedica Internation Aid | Badghis | 55,940 | Completed |
| 6 | Emergency Relief Assistance to Earthquake families | 21-Jun-22 | 22-Jul-22 | Humedica Internation Aid | Paktika | 50,000 | Completed |
| 7 | Emergency livelihood assistance to safeguard food security and local food production of the most vulnerable rural families in Afghanistan affected by drought | 20-Jan-22 | 5-Aug-22 | FAO | Laghman | 46,035 | Completed |
| 8 | Kitchen equipment distribution to IDP, vulnerable and conflict affected families | 1-Sep-22 | 15-Oct-22 | Humedica Internation Aid | Herat and Badghis | 84000 | Completed |
| List of completed projects in 2021 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Humanitarian Mine Clearance Project in Nuristan | 1, May 2021 | 30-Jun-22 | Embassy of Japan | Nuristan, Kamdehs district | 538137 | completed |
| 2 | Humanitarian Assistance (Food and Non-food) distribution to IDPs | 1, September, 2021 | 03, April, 2022 | Humedica Internation Aid | Kabul | 255570 | completed |
| List of completed projects in 2020 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | AFG/UNMAS/20666-001/2020/002. Humanitarian MA in support of MAPA annual plan | 18, August- 2020 | 31,July- 2021 | UNMAS/UNOPS | Pachir-Agam and Shpola districts of Nangarhar province | 486437 | completed |
| 2 | Income from AREA sold equipment | 19, March, 2020 | NA | Kabul | 28000 | completed | |
| List of completed projects in 2019 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Project for Humanitarian Demining in Nangarhar province | 1, March, 2019 | 30, January, 2020 | Japan Embassy | Nangarhar, Kama | 356945 | Completed |
| 2 | Multi Secter Assessment | 1, May, 2019 | 30, July, 2019 | ACTED | Logar, Wardak, Ghazni and Paktiya | 21500 | Completed |
| 3 | Enhance resilience and climate change | 1-Jun-18 | 30-Jun-19 | OXFAM | Kabul | 55000 | Completed |
| List of completed projects in 2018 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Enhance resilience and climate change | 1-Jun-18 | 30-Jun-19 | OXFAM | Kabul | 55000 | Completed |
| 2 | Quality Assurance Monitoring | 6/16/2017 | 6/15/2018 | UNICEF | Paktia and Paktika | 102702.7 | Completed |
| 3 | PMWRA-HD, AREA Afghanistan 1064 | 1/11/2017 | 11/12/2018 | US Department | Nangarhar, Kunar and Laghman | 1,363,000.00 | Completed |
| 4 | PMWRA-HD, AREA Afghanistan 1064 | 1/12/2016 | 9/12/2018 | US Department | Nangarhar five districts | 931,631.00 | Completed |
| B-List of completed projects in 2017 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | UNICEF assessment Project | 16/06/2017 | 15/06/2018 | UNICEF | Paktia and paktika | 5,963,250 AFN | Ongoing |
| 2 | 16.PMWRA.HD.AREA.AFGHANISTAN | 1/12/2016 | 9/12/2017 | US Department of State | Nangarhar in Five Districts | 931,631 USD | Completed |
| 3 | Mine Clearance and Awairness Program | 30-11-2016 | 14/12/2017 | Japan Embassy (GAGP) | Kabul,Kunar | 538,008 USD | Completed |
| 4 | 16.PMWRA.HD.AREA.AFGHANISTAN | 1/11/2017 | 30/10/2018 | US Department of State | Nangarhar,Kunar, Laghman | 1,365,590 USD | Completed |
| B-List of completed projects in 2016 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | Renewable Energy | 10/8/2015 | 9/8/2016 | WHH | Nangarhar /Kama, and khiwa district | 103,874 EUR | Completed |
| 2 | Conservation of Kol-e-Hashmat Khan Wetland in Kabul | 3/3/2015 | 2/3/2017 | UNDP | Kabul | 2,860,355 AFN | completed |
| 3 | Regional Agricultural Development Program (RADP-W) | 1/3/2015 | 28/02/2019 | Chemonics /USAID | Badghis | 9,600,000 AFN | Completed |
| 4 | Vocational Training | 1/12/2015 | 31/05/2016 | ZOA | Kabul | 68,705 EUR | Completed |
| Completed projects in 2015 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Remarks | |
| 1 | WFP assessment project | 9/5/2012 | 31/07/2015 | WFP | Kabul ,Parwan Panjshir,Kapisa,Ghazni and Wardak | 541,068 USD | Completed |
| 2 | WFP assessment project | 1/8/2013 | 31/07/2015 | WFP | Badakhshan and Takhar | 181,989 USD | Completed |
| 3 | WFP assessment project | 1/8/2013 | 31/07/2015 | WFP | Mazar and samangan | 162684 USD | Completed |
| 4 | Conservation of Kol-e-Hashmat Khan Wetland in Kabul | 3/3/2015 | 2/3/2017 | UNDP | Kabul | 2860355 AFN | Completed |
| 5 | Regional Agricultural Development Program (RADP-W) | 1/3/2015 | 28/02/2019 | Chemonics /USAID | Badghis | 251041937 AFN | Completed |
| 6 | Improved food-security by enhancing local non-governmental organizations in samangan province | 1/3/2015 | 31/08/2015 | WHH | Samangan | 51080 EURO | Completed |
| 7 | Emergency assistance to restore the livelihoods of vulnerable farming family | 10/9/2014 | 30/06/2015 | FAO | Samangan, Balkh, Sar-e-pol, Jozjan | 82,181 USD | Completed |
| 8 | Renewable Energy | 10/8/2015 | 9/8/2016 | WHH | Nangarhar /Kama, and khiwa district | 88823 Eur | Completed |
| 9 | Baseline assessment Urban IDPs and Returnees in Kabul City | 26/08/2015 | 25/09/2015 | ZOA | Kabul | 6214 EUR | Completed |
| 10 | Vocational Training | 1/12/2015 | 31/05/2016 | ZOA | Kabul | 68705 EUR | Completed |
| Completed projects in 2014 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Remarks |
| 1 | WFP assessment project | 9/5/2012 | 30/12/2015 | WFP | Kabul ,Parwan Panjshir,Kapisa,Ghazni and Wardak | 310269 USD | Completed |
| 2 | WFP assessment project | 1/8/2013 | 31/07/2015 | WFP | Badakhshan and Takhar | 13646325 AFN | Completed |
| 3 | WFP assessment project | 1/8/2013 | 31/07/2015 | WFP | Mazar and samangan | 10868025 AFN | Completed |
| 4 | Environmental Protection | 1/7/2013 | 31/08/2014 | UNDP | Kabul | 40700 USD | Completed |
| 5 | Vocational training | 20/04/2014 | 20/03/2015 | Italian cooperation | Herat | 6999114 AFN | Completed |
| 6 | UNICEF assessment Project | 1/7/2014 | 30/06/2015 | UNICEF | Paktia and paktika | 8721620 AFN | Completed |
| 7 | Food for asset | 1/3/2014 | 30/10/2014 | WFP | Nangarhr | 7981 USD | Completed |
| 8 | Food for work | 15/05/2014 | 15/07/2014 | WFP | Nangarhar | 2280 USD | Completed |
| Completed projects in 2012 and 2013 | |||||||
| NO | Project name | Start date | End date | Donor | Location | Total budget | Status |
| 1 | Road construction project | 26/05/2013 | 31/12/2013 | UNHCR | Parwan | 322623 | Complete |
| 2 | Program for the increase agricultural production | 1/11/2012 | 30/11/2013 | FAO | Badghis | 164920 | Complete |
| 3 | Vocational training for 120 Women | 15/11/2012 | 15/06/2012 | GMU | Herat | 64000 | Complete |
| 4 | Food for work | 1/11/2012 | 30/04/2013 | WFP | Nangarhar | 140000 | Complete |
| Completed projects in 2011 | |||||||
| No | Project name | Start date | End date | Donor | Location | Total budget | Status |
| 1 | Distribution of wheat seeds in fertilizer | 15/09/2011 | 15/11/2012 | FAO | Kunduz | 192000 | Completed |
| 2 | Reception and distribution of animal concentrate feed | 10/7/2011 | 30/07/2012 | FAO | Kunduz | 87500 | Completed |
| 3 | Budget breakdown for maintaining of 750 MT animal food | 2/6/2011 | 2/12/2011 | FAO | Kunduz | 10200 | Completed |
| 4 | VTAWAP Procedure Group, Home base, on the job training and Employment project | 1/4/2011 | 31/08/2011 | CARE | Kabul | 31894 | Completed |
| 5 | Vocational training to 165 unoccupied people in kunar | 15/11/2011 | 15/06/2012 | NSDP | Kunar | 82897 | Completed |
| Completed projects in 2010 | |||||||
| NO | Name of project | Start date | End date | Donor | location | Total budget & USD | Remarks |
| 1 | Vocational trainings for BAG making skill | 20/07/2009 | 20/02/2010 | CIDA/CARE | District 5 Kabul | 16580 | Completed |
| 2 | Vocational training for plumbing | 20/07/2009 | 22/02/2010 | CIDA/CARE | District 5 kabul | 34590 | Completed |
| 3 | Vocational training for charma dozi | 20/07/2009 | 22/02/2010 | CIDA/CARE | District 5 kabul | 14962 | Completed |
| 4 | Wenter cost for vocational training bad making charma dozi and mohra dozi | 20/07/2009 | 22/02/2010 | CIDA/CARE | District 5 kabul | 642 | Completed |
| 5 | VTAWP | 1/3/2009 | 28/02/2010 | CIDA/CARE | Kabul | 9840 | Completed |
| 6 | Vocational training for BPRM project | 19/10/2009 | 18/04/2010 | CIDA/CARE | SPRMCO08CA102-A001-AREA 01 | 41762 | Completed |
| 7 | Vocational training for afghan women (bag making skill training ) | 15/02/2010 | 30/06/2010 | CARE | District 5 kabul | 17819 | Completed |
| 8 | Vocational training for afghan women (electrical house wiring) | 15/02/2010 | 30/06/2010 | CARE | District 5 kabul | 31812 | Completed |
| 9 | Targeted assistance for food insecure families in balkh (TAFFB) | 1/1/2010 | 20/09/2011 | EC-CARE | Balkh | 563569 | Completed |
| 10 | Program for the increase agricultural production | 1/8/2010 | 30/11/2011 | FAO | Kunduz | 98400 | Completed |
| 11 | Program for the increase agricultural production | 1/6/2010 | 30/09/2011 | FAO | Kunar | 60000 | Completed |
| 12 | Vocational training for afghan women (business development, marketing ,entreprenuorship ,extra life skill training) | 1/8/2010 | 30/11/2011 | CARE | Kabul | 37196 | Completed |
| Completed projects in 2009 | |||||||
| S. No | Name of project | Starting date | End date | Donor | Location | Total budget | Remarks |
| 1 | Alishaa khel Karez cleaning KP061 | 18-Jan-09 | 3-Mar-09 | ARD | Kapisa ,Alasai District | 12,640 USD | |
| 2 | Dar Karez Cleaning KP063 | do | do | Do | Do | 36,675 USD | |
| 3 | Hasankhel Canal Cleaning Kp 064 | do | do | Do | Do | 18, 175 | |
| 4 | Kaker Karez cleaning KP065 | do | do | DO | Do | 22, 920 USD | |
| 5 | Khairkhel Karez cleaning KP0 66 | do | do | DO | Do | 11,800 USD | |
| 6 | Malek peroz Karez cleaning KP0 68 | do | do | DO | Do | 22,050 USD | |
| 7 | Sher aka khel Karez KP0 70 | do | do | DO | Do | 15,965 USD | |
| 8 | Computer training Hard and soft ware | 29-Jan-09 | 28-Jul-09 | CARE/ CIDA | D# 5 Kabul City | 1,882,925 AFN OR 36,210 USD | |
| 9 | Wheat seeds and fertilizer distribution | 8-Feb-09 | 31-Dec-09 | FAO/ CIDA | Samangan Roi Do Ad district | 14,000 USD | |
| 10 | Charma Dozi training | 24-Feb-09 | 21-Aug-09 | CARE | D# 7 Kabul City | 656,350 AFN Or13, 127 USD | |
| 11 | Bag Making | 24-Feb-09 | 21-Aug-09 | CARE | D# 7 Kabul City | 1,166,055 AFN Or 23,321 USD | |
| 12 | Computer Hard & Soft Ware training | 24-Feb-09 | 21-Aug-09 | CARE | D# 5 Kabul City | 923,890 AFN or 18,477 USD | |
| 13 | 10 Vocational trainings ( different) | 1-Feb-09 | 30-Jul-09 | IOM | Hirat province | 124,561 USD | |
| 14 | 3 vocational training (Different) | 20-Jul-09 | 20-Jan-10 | CARE | D# 5 Kabul | 3,306,617 AFN = 66,132 USD | |
| 15 | Wheat seeds and fertilizer distribution | 1, Sep 09 | 30-Sep-10 | FAO | 3 district of Jowzjan province | 54,600 USD | |
| 16 | Wheat seeds & fertilizer distribution | do | do | FAO | 5 distircts of Jalalabad province | 64,600 USD | |
| 17 | 3 vocational training (different) | 17 Oct, 09 | 18.April 2010 | CARE/ BPRM | District Qarabagh Kabul province | 41,762 USD | |
| Completed projects in 2008 | |||||||
| S. No | Name of project | Starting date | End date | Donor | Location | Total budget | Remark |
| 1 | Seed and fertilizer distribution 606 | 15-Sep-07 | 15-Sep-08 | FAO | Logar Khoshi | 9,740 USD | |
| 2 | Seed and fertilizer distribution 703 | 12-Mar-08 | 30-Dec-08 | FAO | Badghis | 16,660 USD | |
| 3 | Animal concentrate distribution 802 | 8-May-08 | 30-Oct-08 | FAO -EC | Hirat & Badghis | 23,600 USD | |
| 4 | Animal concentrate distribution 803 | 8-May-08 | 30-Oct-08 | FAO- CERF | Hirat& Badghis | 40,692 USD | |
| 5 | Vocational training | 10-Aug-08 | 10-Oct-08 | IRC- ECHO | Paktia | 19,000 USD | |
| 6 | Survey of reservoir | 10-Jun-08 | 10-Jul-08 | GTZ- PAL | Nengrahar | 4,516 USD | |
| 7 | Vocational training for women charma dozi | 15-Aug-08 | 14-Feb-09 | CARE- CIDA | Kabul D# 7 | AFN-1,278,558 | =25,571.16 USD |
| 8 | Road Rehabilitation | 15-Aug-08 | 15-Oct-08 | ARD- LGCD USAID | Badghis Bala Murghab | 139,705.5 USD | |
| 9 | Animal Vaccination | 6-Oct-08 | 6-Jan-09 | FAO | Herat and Badghis | 72,500 USD | |
| 10 | Canal cleaning | 1st November 08 | 1st December 08 | ARD-ALGCD USAID | Kapisa Tagab | 24, 354 USD | |
| 11 | Vocational training for men plumbing | 6-Nov-08 | 5-May-09 | CARE CIDA | Kabul D# 8 | 1,836,144 | 35,310.46 |
| Completed projects in 2007 | |||||||
| S. No | Name of project | Starting date | End date | Donor | Location | Total budget | Remark |
| 1 | RISE 2nd | 1-Feb-07 | 31 June 07 | FAO | Nengrahar | 35,470 USD | |
| 2 | Seeds and fertilizer distribution 605 | 3-Dec-06 | 31 Decemebr07 | FAO | Logar, Herat and Badghis | 34,760 USD | |
| 3 | Livelihood and food security | 1-Apr-07 | 31-Dec-07 | EC | Mazar | 476 000 EURO = 714,000 USD | |
| 4 | Orchards , Check dams & terracing | 8-May-07 | 2 years(Jan09) | MOAI | Nengrahar | 1,193,000 USD | |
| 5 | Vocational training | 15-May-07 | 15-Dec-07 | IRC | Kabul | 24,470 USD | |
| 6 | Peace building | 15-Aug-07 | 15-Oct-07 | ACSF | Logar | 12,000 USD | |
| Completed projects in 2006 | |||||||
| S. No | Name of project | Starting date | End date | Donor | Location | Total budget USD | Remark |
| 1 | Construction of Urdo khan primary school | 15-Jun-05 | 30 Decmeber06 | GAGP Japan Embassy | , Heart | 89,995 | |
| 2 | Road rehabilitation | 5-Dec-05 | 12-Jul-06 | RAMP | Mazarr | 95,000 | |
| 3 | Seeds and fertilizer distribution 505 | 13-Jan-06 | 30-Oct-06 | FAO | Kabul and Nengrahar | 40,560 | |
| 4 | RISE | I June 06 | 31-Jan-07 | FAO | Nengrahar | 78,276 | |
| Completed projects in 2005 | |||||||
| S. No | Name of project | Starting date | End date | Donor | Location | Total budget USD | Remark |
| 1 | Civic education | 10-May-05 | 31-Dec-05 | ACSF | Nengrahar, Kuner, Heart & baddghis | 1,646,500 | |
| 2 | Construction of a health clinic | 8-Mar-05 | 30-Dec-05 | GAGP Japan Embassy | Mohd Agha district of Logar | 79, 659 | |
| 3 | Irrigation infrastructure | 2005 | 2006 | GAGP Japan Embassy | Nengrahar province | 65, 760 | |
| 4 | Irrigation infrastructure | 2005 | 2006 | GAGP Japan Embassy | Mazar | 68, 500 | |