List of completed projects in 2023 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Winter Relief Assistance |
1-Feb-23 |
15, March, 2023 |
Humedica Internation Aid |
Kabul |
54,000 |
Completed |
2 |
Provision of lifesaving food assistance to IPC Phase 3 and 4 food insecure vulnerable people in Shamal & Spera Districts of Khost Province |
25-Jan-23 |
24/09/2023 |
AHF-OCHA |
Khost |
532,080 |
Completed |
3 |
Mine Clearance and Survey in Nuristan |
6/1/2023 |
11/30/2023 |
Japan Embassy |
Nuristan |
509737 |
Completed |
List of completed projects in 2022 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Emergency Relief Assistance to Earthquake families |
21-Jun-22 |
22-Jul-22 |
Humedica Internation Aid |
Paktika |
50,000 |
Completed |
2 |
Mine Clearance and Survey in Kunar |
5-Sep-22 |
4-Mar-23 |
AHF-OCHA |
Kunar |
399000 |
Completed |
3 |
Mine Clearance and Survey in Nuristan |
8/10/2022 |
7/30/2023 |
USDOS |
Nuristan |
600000 |
Completed |
4 |
Cash distribution to flood effected families project in Badghis |
15-May-22 |
30-Jun-22 |
Humedica Internation Aid |
Badghis |
69,000 |
Completed |
5 |
Reconstruction of houses destroyed by the earthquake |
15-Mar-22 |
30-Jun-22 |
Humedica Internation Aid |
Badghis |
55,940 |
Completed |
6 |
Emergency Relief Assistance to Earthquake families |
21-Jun-22 |
22-Jul-22 |
Humedica Internation Aid |
Paktika |
50,000 |
Completed |
7 |
Emergency livelihood assistance to safeguard food security and local food production of the most vulnerable rural families in Afghanistan affected by drought |
20-Jan-22 |
5-Aug-22 |
FAO |
Laghman |
46,035 |
Completed |
8 |
Kitchen equipment distribution to IDP, vulnerable and conflict affected families |
1-Sep-22 |
15-Oct-22 |
Humedica Internation Aid |
Herat and Badghis |
84000 |
Completed |
List of completed projects in 2021 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Humanitarian Mine Clearance Project in Nuristan |
1, May 2021 |
30-Jun-22 |
Embassy of Japan |
Nuristan, Kamdehs district |
538137 |
completed |
2 |
Humanitarian Assistance (Food and Non-food) distribution to IDPs |
1, September, 2021 |
03, April, 2022 |
Humedica Internation Aid |
Kabul |
255570 |
completed |
List of completed projects in 2020 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
AFG/UNMAS/20666-001/2020/002. Humanitarian MA in support of MAPA annual plan |
18, August- 2020 |
31,July- 2021 |
UNMAS/UNOPS |
Pachir-Agam and Shpola districts of Nangarhar province |
486437 |
completed |
2 |
Income from AREA sold equipment |
19, March, 2020 |
NA |
Kabul |
28000 |
completed |
List of completed projects in 2019 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Project for Humanitarian Demining in Nangarhar province |
1, March, 2019 |
30, January, 2020 |
Japan Embassy |
Nangarhar, Kama |
356945 |
Completed |
2 |
Multi Secter Assessment |
1, May, 2019 |
30, July, 2019 |
ACTED |
Logar, Wardak, Ghazni and Paktiya |
21500 |
Completed |
3 |
Enhance resilience and climate change |
1-Jun-18 |
30-Jun-19 |
OXFAM |
Kabul |
55000 |
Completed |
List of completed projects in 2018 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Enhance resilience and climate change |
1-Jun-18 |
30-Jun-19 |
OXFAM |
Kabul |
55000 |
Completed |
2 |
Quality Assurance Monitoring |
6/16/2017 |
6/15/2018 |
UNICEF |
Paktia and Paktika |
102702.7 |
Completed |
3 |
PMWRA-HD, AREA Afghanistan 1064 |
1/11/2017 |
11/12/2018 |
US Department |
Nangarhar, Kunar and Laghman |
1,363,000.00 |
Completed |
4 |
PMWRA-HD, AREA Afghanistan 1064 |
1/12/2016 |
9/12/2018 |
US Department |
Nangarhar five districts |
931,631.00 |
Completed |
B-List of completed projects in 2017 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
UNICEF assessment Project |
16/06/2017 |
15/06/2018 |
UNICEF |
Paktia and paktika |
5,963,250 AFN |
Ongoing |
2 |
16.PMWRA.HD.AREA.AFGHANISTAN |
1/12/2016 |
9/12/2017 |
US Department of State |
Nangarhar in Five Districts |
931,631 USD |
Completed |
3 |
Mine Clearance and Awairness Program |
30-11-2016 |
14/12/2017 |
Japan Embassy (GAGP) |
Kabul,Kunar |
538,008 USD |
Completed |
4 |
16.PMWRA.HD.AREA.AFGHANISTAN |
1/11/2017 |
30/10/2018 |
US Department of State |
Nangarhar,Kunar, Laghman |
1,365,590 USD |
Completed |
B-List of completed projects in 2016 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Renewable Energy |
10/8/2015 |
9/8/2016 |
WHH |
Nangarhar /Kama, and khiwa district |
103,874 EUR |
Completed |
2 |
Conservation of Kol-e-Hashmat Khan Wetland in Kabul |
3/3/2015 |
2/3/2017 |
UNDP |
Kabul |
2,860,355 AFN |
completed |
3 |
Regional Agricultural Development Program (RADP-W) |
1/3/2015 |
28/02/2019 |
Chemonics /USAID |
Badghis |
9,600,000 AFN |
Completed |
4 |
Vocational Training |
1/12/2015 |
31/05/2016 |
ZOA |
Kabul |
68,705 EUR |
Completed |
Completed projects in 2015 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
|
Remarks |
1 |
WFP assessment project |
9/5/2012 |
31/07/2015 |
WFP |
Kabul ,Parwan Panjshir,Kapisa,Ghazni and Wardak |
541,068 USD |
Completed |
2 |
WFP assessment project |
1/8/2013 |
31/07/2015 |
WFP |
Badakhshan and Takhar |
181,989 USD |
Completed |
3 |
WFP assessment project |
1/8/2013 |
31/07/2015 |
WFP |
Mazar and samangan |
162684 USD |
Completed |
4 |
Conservation of Kol-e-Hashmat Khan Wetland in Kabul |
3/3/2015 |
2/3/2017 |
UNDP |
Kabul |
2860355 AFN |
Completed |
5 |
Regional Agricultural Development Program (RADP-W) |
1/3/2015 |
28/02/2019 |
Chemonics /USAID |
Badghis |
251041937 AFN |
Completed |
6 |
Improved food-security by enhancing local non-governmental organizations in samangan province |
1/3/2015 |
31/08/2015 |
WHH |
Samangan |
51080 EURO |
Completed |
7 |
Emergency assistance to restore the livelihoods of vulnerable farming family |
10/9/2014 |
30/06/2015 |
FAO |
Samangan, Balkh, Sar-e-pol, Jozjan |
82,181 USD |
Completed |
8 |
Renewable Energy |
10/8/2015 |
9/8/2016 |
WHH |
Nangarhar /Kama, and khiwa district |
88823 Eur |
Completed |
9 |
Baseline assessment Urban IDPs and Returnees in Kabul City |
26/08/2015 |
25/09/2015 |
ZOA |
Kabul |
6214 EUR |
Completed |
10 |
Vocational Training |
1/12/2015 |
31/05/2016 |
ZOA |
Kabul |
68705 EUR |
Completed |
Completed projects in 2014 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
WFP assessment project |
9/5/2012 |
30/12/2015 |
WFP |
Kabul ,Parwan Panjshir,Kapisa,Ghazni and Wardak |
310269 USD |
Completed |
2 |
WFP assessment project |
1/8/2013 |
31/07/2015 |
WFP |
Badakhshan and Takhar |
13646325 AFN |
Completed |
3 |
WFP assessment project |
1/8/2013 |
31/07/2015 |
WFP |
Mazar and samangan |
10868025 AFN |
Completed |
4 |
Environmental Protection |
1/7/2013 |
31/08/2014 |
UNDP |
Kabul |
40700 USD |
Completed |
5 |
Vocational training |
20/04/2014 |
20/03/2015 |
Italian cooperation |
Herat |
6999114 AFN |
Completed |
6 |
UNICEF assessment Project |
1/7/2014 |
30/06/2015 |
UNICEF |
Paktia and paktika |
8721620 AFN |
Completed |
7 |
Food for asset |
1/3/2014 |
30/10/2014 |
WFP |
Nangarhr |
7981 USD |
Completed |
8 |
Food for work |
15/05/2014 |
15/07/2014 |
WFP |
Nangarhar |
2280 USD |
Completed |
Completed projects in 2012 and 2013 |
NO |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Status |
1 |
Road construction project |
26/05/2013 |
31/12/2013 |
UNHCR |
Parwan |
322623 |
Complete |
2 |
Program for the increase agricultural production |
1/11/2012 |
30/11/2013 |
FAO |
Badghis |
164920 |
Complete |
3 |
Vocational training for 120 Women |
15/11/2012 |
15/06/2012 |
GMU |
Herat |
64000 |
Complete |
4 |
Food for work |
1/11/2012 |
30/04/2013 |
WFP |
Nangarhar |
140000 |
Complete |
Completed projects in 2011 |
No |
Project name |
Start date |
End date |
Donor |
Location |
Total budget |
Status |
1 |
Distribution of wheat seeds in fertilizer |
15/09/2011 |
15/11/2012 |
FAO |
Kunduz |
192000 |
Completed |
2 |
Reception and distribution of animal concentrate feed |
10/7/2011 |
30/07/2012 |
FAO |
Kunduz |
87500 |
Completed |
3 |
Budget breakdown for maintaining of 750 MT animal food |
2/6/2011 |
2/12/2011 |
FAO |
Kunduz |
10200 |
Completed |
4 |
VTAWAP Procedure Group, Home base, on the job training and Employment project |
1/4/2011 |
31/08/2011 |
CARE |
Kabul |
31894 |
Completed |
5 |
Vocational training to 165 unoccupied people in kunar |
15/11/2011 |
15/06/2012 |
NSDP |
Kunar |
82897 |
Completed |
Completed projects in 2010 |
NO |
Name of project |
Start date |
End date |
Donor |
location |
Total budget & USD |
Remarks |
1 |
Vocational trainings for BAG making skill |
20/07/2009 |
20/02/2010 |
CIDA/CARE |
District 5 Kabul |
16580 |
Completed |
2 |
Vocational training for plumbing |
20/07/2009 |
22/02/2010 |
CIDA/CARE |
District 5 kabul |
34590 |
Completed |
3 |
Vocational training for charma dozi |
20/07/2009 |
22/02/2010 |
CIDA/CARE |
District 5 kabul |
14962 |
Completed |
4 |
Wenter cost for vocational training bad making charma dozi and mohra dozi |
20/07/2009 |
22/02/2010 |
CIDA/CARE |
District 5 kabul |
642 |
Completed |
5 |
VTAWP |
1/3/2009 |
28/02/2010 |
CIDA/CARE |
Kabul |
9840 |
Completed |
6 |
Vocational training for BPRM project |
19/10/2009 |
18/04/2010 |
CIDA/CARE |
SPRMCO08CA102-A001-AREA 01 |
41762 |
Completed |
7 |
Vocational training for afghan women (bag making skill training ) |
15/02/2010 |
30/06/2010 |
CARE |
District 5 kabul |
17819 |
Completed |
8 |
Vocational training for afghan women (electrical house wiring) |
15/02/2010 |
30/06/2010 |
CARE |
District 5 kabul |
31812 |
Completed |
9 |
Targeted assistance for food insecure families in balkh (TAFFB) |
1/1/2010 |
20/09/2011 |
EC-CARE |
Balkh |
563569 |
Completed |
10 |
Program for the increase agricultural production |
1/8/2010 |
30/11/2011 |
FAO |
Kunduz |
98400 |
Completed |
11 |
Program for the increase agricultural production |
1/6/2010 |
30/09/2011 |
FAO |
Kunar |
60000 |
Completed |
12 |
Vocational training for afghan women (business development, marketing ,entreprenuorship ,extra life skill training) |
1/8/2010 |
30/11/2011 |
CARE |
Kabul |
37196 |
Completed |
Completed projects in 2009 |
S. No |
Name of project |
Starting date |
End date |
Donor |
Location |
Total budget |
Remarks |
1 |
Alishaa khel Karez cleaning KP061 |
18-Jan-09 |
3-Mar-09 |
ARD |
Kapisa ,Alasai District |
12,640 USD |
|
2 |
Dar Karez Cleaning KP063 |
do |
do |
Do |
Do |
36,675 USD |
|
3 |
Hasankhel Canal Cleaning Kp 064 |
do |
do |
Do |
Do |
18, 175 |
|
4 |
Kaker Karez cleaning KP065 |
do |
do |
DO |
Do |
22, 920 USD |
|
5 |
Khairkhel Karez cleaning KP0 66 |
do |
do |
DO |
Do |
11,800 USD |
|
6 |
Malek peroz Karez cleaning KP0 68 |
do |
do |
DO |
Do |
22,050 USD |
|
7 |
Sher aka khel Karez KP0 70 |
do |
do |
DO |
Do |
15,965 USD |
|
8 |
Computer training Hard and soft ware |
29-Jan-09 |
28-Jul-09 |
CARE/ CIDA |
D# 5 Kabul City |
1,882,925 AFN OR 36,210 USD |
|
9 |
Wheat seeds and fertilizer distribution |
8-Feb-09 |
31-Dec-09 |
FAO/ CIDA |
Samangan Roi Do Ad district |
14,000 USD |
|
10 |
Charma Dozi training |
24-Feb-09 |
21-Aug-09 |
CARE |
D# 7 Kabul City |
656,350 AFN Or13, 127 USD |
|
11 |
Bag Making |
24-Feb-09 |
21-Aug-09 |
CARE |
D# 7 Kabul City |
1,166,055 AFN Or 23,321 USD |
|
12 |
Computer Hard & Soft Ware training |
24-Feb-09 |
21-Aug-09 |
CARE |
D# 5 Kabul City |
923,890 AFN or 18,477 USD |
|
13 |
10 Vocational trainings ( different) |
1-Feb-09 |
30-Jul-09 |
IOM |
Hirat province |
124,561 USD |
|
14 |
3 vocational training (Different) |
20-Jul-09 |
20-Jan-10 |
CARE |
D# 5 Kabul |
3,306,617 AFN = 66,132 USD |
|
15 |
Wheat seeds and fertilizer distribution |
1, Sep 09 |
30-Sep-10 |
FAO |
3 district of Jowzjan province |
54,600 USD |
|
16 |
Wheat seeds & fertilizer distribution |
do |
do |
FAO |
5 distircts of Jalalabad province |
64,600 USD |
|
17 |
3 vocational training (different) |
17 Oct, 09 |
18.April 2010 |
CARE/ BPRM |
District Qarabagh Kabul province |
41,762 USD |
|
Completed projects in 2008 |
S. No |
Name of project |
Starting date |
End date |
Donor |
Location |
Total budget |
Remark |
1 |
Seed and fertilizer distribution 606 |
15-Sep-07 |
15-Sep-08 |
FAO |
Logar Khoshi |
9,740 USD |
|
2 |
Seed and fertilizer distribution 703 |
12-Mar-08 |
30-Dec-08 |
FAO |
Badghis |
16,660 USD |
|
3 |
Animal concentrate distribution 802 |
8-May-08 |
30-Oct-08 |
FAO -EC |
Hirat & Badghis |
23,600 USD |
|
4 |
Animal concentrate distribution 803 |
8-May-08 |
30-Oct-08 |
FAO- CERF |
Hirat& Badghis |
40,692 USD |
|
5 |
Vocational training |
10-Aug-08 |
10-Oct-08 |
IRC- ECHO |
Paktia |
19,000 USD |
|
6 |
Survey of reservoir |
10-Jun-08 |
10-Jul-08 |
GTZ- PAL |
Nengrahar |
4,516 USD |
|
7 |
Vocational training for women charma dozi |
15-Aug-08 |
14-Feb-09 |
CARE- CIDA |
Kabul D# 7 |
AFN-1,278,558 |
=25,571.16 USD |
8 |
Road Rehabilitation |
15-Aug-08 |
15-Oct-08 |
ARD- LGCD USAID |
Badghis Bala Murghab |
139,705.5 USD |
|
9 |
Animal Vaccination |
6-Oct-08 |
6-Jan-09 |
FAO |
Herat and Badghis |
72,500 USD |
|
10 |
Canal cleaning |
1st November 08 |
1st December 08 |
ARD-ALGCD USAID |
Kapisa Tagab |
24, 354 USD |
|
11 |
Vocational training for men plumbing |
6-Nov-08 |
5-May-09 |
CARE CIDA |
Kabul D# 8 |
1,836,144 |
35,310.46 |
Completed projects in 2007 |
S. No |
Name of project |
Starting date |
End date |
Donor |
Location |
Total budget |
Remark |
1 |
RISE 2nd |
1-Feb-07 |
31 June 07 |
FAO |
Nengrahar |
35,470 USD |
|
2 |
Seeds and fertilizer distribution 605 |
3-Dec-06 |
31 Decemebr07 |
FAO |
Logar, Herat and Badghis |
34,760 USD |
|
3 |
Livelihood and food security |
1-Apr-07 |
31-Dec-07 |
EC |
Mazar |
476 000 EURO = 714,000 USD |
|
4 |
Orchards , Check dams & terracing |
8-May-07 |
2 years(Jan09) |
MOAI |
Nengrahar |
1,193,000 USD |
|
5 |
Vocational training |
15-May-07 |
15-Dec-07 |
IRC |
Kabul |
24,470 USD |
|
6 |
Peace building |
15-Aug-07 |
15-Oct-07 |
ACSF |
Logar |
12,000 USD |
|
Completed projects in 2006 |
S. No |
Name of project |
Starting date |
End date |
Donor |
Location |
Total budget USD |
Remark |
1 |
Construction of Urdo khan primary school |
15-Jun-05 |
30 Decmeber06 |
GAGP Japan Embassy |
, Heart |
89,995 |
|
2 |
Road rehabilitation |
5-Dec-05 |
12-Jul-06 |
RAMP |
Mazarr |
95,000 |
|
3 |
Seeds and fertilizer distribution 505 |
13-Jan-06 |
30-Oct-06 |
FAO |
Kabul and Nengrahar |
40,560 |
|
4 |
RISE |
I June 06 |
31-Jan-07 |
FAO |
Nengrahar |
78,276 |
|
Completed projects in 2005 |
S. No |
Name of project |
Starting date |
End date |
Donor |
Location |
Total budget USD |
Remark |
1 |
Civic education |
10-May-05 |
31-Dec-05 |
ACSF |
Nengrahar, Kuner, Heart & baddghis |
1,646,500 |
|
2 |
Construction of a health clinic |
8-Mar-05 |
30-Dec-05 |
GAGP Japan Embassy |
Mohd Agha district of Logar |
79, 659 |
|
3 |
Irrigation infrastructure |
2005 |
2006 |
GAGP Japan Embassy |
Nengrahar province |
65, 760 |
|
4 |
Irrigation infrastructure |
2005 |
2006 |
GAGP Japan Embassy |
Mazar |
68, 500 |
|